Dell EMC Isilon Specialist Platform Engineers (E20-655) Certification Sample Questions

Isilon Specialist Platform Engineers Dumps, E20-655 Dumps, E20-655 PDF, Isilon Specialist Platform Engineers VCE, Dell EMC E20-655 VCE, Dell EMC DCS-PE PDFThe purpose of this Sample Question Set is to provide you with information about the Dell EMC Isilon Specialist Platform Engineers exam. These sample questions will make you very familiar with both the type and the difficulty level of the questions on the E20-655 certification test. To get familiar with real exam environment, we suggest you try our Sample Dell EMC Isilon Specialist Platform Engineers Certification Practice Exam. This sample practice exam gives you the feeling of reality and is a clue to the questions asked in the actual Dell EMC Certified Specialist - Platform Engineer - PowerScale (DCS-PE) certification exam.

These sample questions are simple and basic questions that represent likeness to the real Dell EMC E20-655 exam questions. To assess your readiness and performance with real time scenario based questions, we suggest you prepare with our Premium Dell EMC Isilon Specialist Platform Engineers Certification Practice Exam. When you solve real time scenario based questions practically, you come across many difficulties that give you an opportunity to improve.

Dell EMC E20-655 Sample Questions:

01. In a Dell EMC Isilon, what is the minimum number of Gen 6 nodes required to create a new cluster?
a) Two
b) Three
c) Four
d) Five
 
02. You are reinstalling the drive suitcases back into four new HD400 nodes you just installed. What is an important consideration when putting the suitcases back into the nodes?
a) SSD must be installed in the lowest node number
b) SSD must be installed in the highest bay number
c) SSD must be installed in the lowest bay number
d) SSDs must be installed evenly across each node
 
03. Once a new Dell EMC Isilon cluster is configured, you should perform an HTTP test. What is the proper way to test the HTTP connectivity?
a) Connect to the FQDNS name using NFS
b) Map a drive to a windows share and test if copying a file works
c) Connect to http://FQDNS name/IFS
d) Connect to the WebUI using https://clusteripaddress:8080
 
04. A company is deploying a Dell EMC Isilon cluster for the first time and requests an Isilon platform engineer to configure the Isilon cluster.
What is recommended to perform the initial configuration of the Isilon cluster?
a) Use the front panel to create the cluster
b) Connect using a VGA cable to access the Configuration wizard prompt
c) Connect to the node using a serial cable
d) Access the cluster through the customer’s network by launching a serial terminal emulator
 
05. To maintain high-availability on Dell EMC Isilon Gen 5 or Gen 6 clusters, two back-end switches are required. What is the proper installation of the back-end switches?
a) Switch A should be connected to the left PDU and switch B should be connected to the right PDU
b) Switch ports should face the rear of the rack
c) Switch power supplies require a UPS for each connected circuit
d) When racking the switches, leave at least 1U of space between the switches to allow adequate air flow for cooling
 
06. Which external Ethernet networks are available for Gen 6 nodes?
a) 1 GbE and 10 GbE
b) 1 GbE and 40 GbE
c) 10 GbE and 40 GbE
d) 10 GbE and 100 GbE
 
07. During a new installation, why do SAS/SATA drives in Dell EMC Isilon Gen 5 nodes need to be fully-seated before the node powers on?
a) Node will continuously reboot
b) Drives not fully-seated will not be recognized
c) Node will not power on
d) Drives not fully-seated will fail
 
08. You are cabling new Dell EMC Isilon Gen 6 nodes to an existing Gen 6 cluster. What is an important consideration for the internal network connectivity?
a) Each cluster node must be connected to both of the internal networks
b) An internal network consisting of only Ethernet switches is not supported
c) The redundant internal network must be configured as a single full-mesh network
d) An internal network consisting of only InfiniBand switches is not supported
 
09. What is a responsibility of a Dell EMC Isilon platform engineer?
a) Implements Active Directory integration on the Isilon cluster
b) Creates the Configuration Guide
c) Creates the delivery schedule
d) Initializes the Isilon cluster and handovers the initialization logs
 
10. You are installing a fully populated Gen 6 chassis in a customer rack and no lift is available. Using no less than two people to lift the chassis, which components must be removed before lifting is attempted?
a) Drive sleds and compute modules
b) Hard drives
c) Hard drives and power supplies
d) Drive sleds and power supplies

Answers:

Question: 01
Answer: c
Question: 02
Answer: c
Question: 03
Answer: d
Question: 04
Answer: c
Question: 05
Answer: b
Question: 06
Answer: c
Question: 07
Answer: b
Question: 08
Answer: a
Question: 09
Answer: d
Question: 10
Answer: a

Note: For any error in Dell EMC Certified Specialist - Platform Engineer - PowerScale (DCS-PE) (E20-655) certification exam sample questions, please update us by writing an email on feedback@edusum.com.

Rating: 5 / 5 (59 votes)