Dell Technologies Implementation Engineer VxBlock Specialist (DES-6122) Certification Sample Questions

Implementation Engineer VxBlock Specialist Dumps, DES-6122 Dumps, DES-6122 PDF, Implementation Engineer VxBlock Specialist VCE, Dell Technologies DES-6122 VCE, Dell Technologies Implementation Engineer VxBlock Specialist PDFThe purpose of this Sample Question Set is to provide you with information about the Dell Technologies Specialist for Implementation Engineer VxBlock exam. These sample questions will make you very familiar with both the type and the difficulty level of the questions on the DES-6122 certification test. To get familiar with real exam environment, we suggest you try our Sample Dell Technologies Implementation Engineer VxBlock Specialist Certification Practice Exam. This sample practice exam gives you the feeling of reality and is a clue to the questions asked in the actual Dell Technologies Certified Specialist - Implementation Engineer - VxBlock certification exam.

These sample questions are simple and basic questions that represent likeness to the real Dell Technologies DES-6122 exam questions. To assess your readiness and performance with real time scenario based questions, we suggest you prepare with our Premium Dell Technologies Implementation Engineer VxBlock Specialist Certification Practice Exam. When you solve real time scenario based questions practically, you come across many difficulties that give you an opportunity to improve.

Dell Technologies DES-6122 Sample Questions:

01. Who is an optional resource during an RCM upgrade escalation?
a) Customer Advocate
b) Program Manager
c) Account Team
d) Assessment Lead
 
02. In which phase of the RCM Upgrade process does the warm hand-off between the Assessment team and the RCM Upgrade Team occur?
a) Closure and Lessons Learned
b) Executing and Controlling
c) Planning
d) Initiation
 
03. Which data layout technique is used by Isilon OneFS to provide N-way failure and tolerance?
a) Forward Error Correction (FEC) and File Striping with Mirroring
b) File Striping only
c) Forward Error Correction (FEC) only
d) Mirroring only
 
04. During which phase of the RCM Upgrade Timeline should the Pre-Upgrade Questionnaire be completed and reviewed by the team?
a) Remediation
b) Assessment
c) Kickoff
d) Initialization
 
05. What files are used to validate the VxBlock components in VxBlock Central Core Vision VM during an RCM upgrade?
a) system.json and vblock.xml
b) system.cfg and vblock.xml
c) system.cfg and vblock.json
d) vblock.xml and scr.cfg
 
06. Based on the RCM Upgrade RACI, which role owns the process, and which role provides input to the process?
a) Owner: Assessment Lead
Provides input: Assessment Team
b) Owner: Assessment Lead
Provides input: Project Manager
c) Owner: Program Manager
Provides input: Project Manager
d) Owner: Project Manager
Provides input: Assessment Lead
 
07. How many business days is the duration of a Knowledge Transfer session?
a) 1
b) 2
c) 3
d) 4
 
08. You are deploying a VxBlock system with Cisco ACI. What is a consideration?
a) Leaf switches use 40 GbE vPC peer links
b) Fabric load balancing is achieved using VXLAN
c) A minimum of four uplinks per leaf switch is recommended
d) Leaf switches connect to spines using 40 GbE links
 
09. A Cisco UCS 5108 chassis contains five blades. How many additional full-width blades can be added?
a) 0
b) 1
c) 2
d) 3
 
10. Where can VxBlock expansion documents be found?
a) SolVe, support.vce.com
b) FlexNet, CPSD Technical Resource Center
c) SolVe, Nirvana RCM DB
d) CPSD Technical Resource Center, SolVe

Answers:

Question: 01
Answer: a
Question: 02
Answer: b
Question: 03
Answer: a
Question: 04
Answer: c
Question: 05
Answer: b
Question: 06
Answer: d
Question: 07
Answer: a
Question: 08
Answer: d
Question: 09
Answer: b
Question: 10
Answer: d

Note: For any error in Dell Technologies Certified Specialist - Implementation Engineer - VxBlock (DES-6122) certification exam sample questions, please update us by writing an email on feedback@edusum.com.

Rating: 5 / 5 (75 votes)